http://www.engineeringnews.co.za
  SEARCH
Login
R/€ = 13.69Change: -0.05
R/$ = 12.32Change: -0.01
Au 1168.78 $/ozChange: -0.02
Pt 1083.00 $/ozChange: 1.00
 
 
Note: Search is limited to the most recent 250 articles. Set date range to access earlier articles.
Where? With... When?








Start
 
End
 
 
And must exclude these words...
Close Main Search
Close Main Login
My Profile News Alerts Newsletters Logout Close Main Profile
 
Agriculture   Automotive   Chemicals   Competition Policy   Construction   Defence   Economy   Electricity   Energy   Environment   ICT   Metals   Mining   Science and Technology   Services   Trade   Transport & Logistics   Water  
What's On Press Office Tenders Suppliers Directory Research Jobs Announcements Letters Contact Us
 
 
 
RSS Feed
Article   Comments   Other News   Research   Magazine  
 
 
Jul 27, 2012

Concentrated solar demonstration project under way in Gauteng

Back
Engineering|Rosherville|Africa|Bluhm Berton Engineering Group|Building|Components|Eskom|Industrial|Installation|PROJECT|Sustainable|System|Systems|Water|Africa|South Africa|Rosherville Facility|Electricity|Energy|Product|Reflected Energy|Steel|Steel Support Structure|Systems|Chris Nell|Power|Ross Wilson|Water
Engineering||Africa|Building|Components|Eskom|Industrial|Installation|PROJECT|Sustainable|System|Systems|Water|Africa|||Energy|Steel|Systems|Power|Water
engineering|rosherville|africa-company|bluhm-berton-engineering-group|building|components|eskom|industrial|installation|project|sustainable|system|systems-company|water-company|africa|south-africa|rosherville-facility|electricity|energy|product|reflected-energy|steel|steel-support-structure|systems|chris-nell|power|ross-wilson|water
© Reuse this



Sustainable energy specialist Bluhm Burton Energy (BBEnergy), the newest member of Bluhm Burton Engineering Group, is building a new concentrated solar power (CSP) collector demonstration plant at power utility Eskom’s facility in Rosherville.

BBEnergy funded the development of earlier prototypes and unveiled its locally developed product prototype in late 2010.

The CSP collector uses the linear Fresnel configuration and tracks the sun with large glass mirrors mounted on a steel support structure. The reflected energy heats the water in the piping to produce high-pressure steam.

The CSP collector being built at the Rosherville facility will be 14 m wide and 20 m long. It consists of two modules, which are expected to provide a maximum heat power output of 150 kW and about 1400 kWh a day, which will fluctuate according to seasonal changes. The system generates heat rather than electricity.

While linear Fresnel is not a new technology, Eskom is interested in the high degree of local content in this particular demonstration, as the power utility has a strong supplier development and localisation mandate.

“In the event of bad weather, during which the mirrors might be damaged, the system automatically flips the mirrors face-down for protection,” explains BBEnergy MD Chris Nell.

He adds that the system is the first in South Africa and is made of locally available components to support the local economy and reduce the cost of materials. The technology is the result of South African engineering, materials and labour, and has the potential to create a significant number of local jobs.

BBEnergy specialist engineer Ross Wilson designed the system after the company had considered solar energy as an energy-saving initiative for mine cooling and ventilation systems.

The company is currently designing a number of larger installations for industrial clients. Wilson notes that the next installation will probably have an output of 1.2 MW and about 11.2 MWh a day of solar thermal energy, using 16 modules in a 30 m × 80 m field at a site near Klerksdorp.

Edited by: Martin Zhuwakinyu
Creamer Media Senior Deputy Editor
© Reuse this Comment Guidelines (150 word limit)
 
 
 
 
 
 
 
 
Other Electricity News
Wind energy is around half of all renewable energy currently produced in South Africa. As we lurch from one day of load shedding to the next, the sector is showing no sign of losing speed, rather the opposite. SA Wind Energy Association CEO Johan van den Berg told...
Nigeria's Transcorp plans to spend $1.575-billion from 2016 to 2018 to raise its power generation capacity to 2 500 megawatts (MW) from 610 MW now, the company said on Thursday. Transcorp, which also has interest in hotels, oil and gas, said it expected the...
DEPENDABLE SUPPLIER Tswelopele Engineering has established itself as a supplier of voltage regulators, surge arresters and auto-reclosers
Black-owned engineering specialist Tswelopele Engineering is taking part in Power-Gen Africa (PGA) “to enter new markets and to reach potential solution seekers in all of Africa,” says company CEO Bongane Madondo. PGA, which Madondo describes as a product-awareness...
More
 
 
Latest News
An end to wage negotiations within the local government sector could be in sight as a conciliator’s proposal, setting out a number of settlement suggestions to resolve the deadlock, was expected on Monday. The Independent Municipal and Allied Trade Union (Imatu)...
Development financier Eastern Cape Development Corporation (ECDC) executive Noludwe Ncokazi on Friday said the organisation had the “huge responsibility of ensuring business continuity”, following the resignation of ECDC subsidiary Automotive Industry Development...
South Africa’s second-largest oil refinery, Engen Refinery (Enref), is set to undergo a three-day planned maintenance outage from July 9 as part of an ongoing maintenance programme to ensure that the facility, which delivers a significant portion of South Africa’s...
More
 
 
Recent Research Reports
Real Economy Year Book 2015 (PDF Report)
There are very few beacons of hope on South Africa’s economic horizon. Economic growth is weak, unemployment is rising, electricity supply is insufficient to meet demand and/or spur growth, with poor prospects for many of the commodities mined and exported. However,...
Real Economy Insight: Automotive 2015 (PDF Report)
Creamer Media’s Real Economy Year Book comprises separate reports under the banner Real Economy Insight and investigates key developments in the automotive, construction, electricity, road and rail, steel, water, gold, iron-ore and platinum sectors.
Real Economy Insight: Water 2015 (PDF Report)
Creamer Media’s Real Economy Year Book has been divided into individual reports under the banner Real Economy Insight and investigates key developments in the automotive, construction, electricity, road and rail, steel, water, coal, gold, iron-ore and platinum sectors.
Real Economy Insight: Construction 2015 (PDF Report)
Creamer Media’s Real Economy Year Book has been divided into individual reports under the banner Real Economy Insight and investigates key developments in the automotive, construction, electricity, road and rail, steel, water, coal, gold, iron-ore and platinum sectors.
Real Economy Insight: Electricity 2015 (PDF Report)
Creamer Media’s Real Economy Year Book has been divided into individual reports under the banner Real Economy Insight and investigates key developments in the automotive, construction, electricity, road and rail, steel, water, coal, gold, iron-ore and platinum sectors.
Real Economy Insight: Road and Rail 2015 (PDF Report)
Creamer Media’s Real Economy Year Book has been divided into individual reports under the banner Real Economy Insight and investigates key developments in the automotive, construction, electricity, road and rail, steel, water, coal, gold, iron-ore and platinum sectors.
 
 
 
 
 
This Week's Magazine
NHLANHLA NENE The main constraints to economic growth are domestic
Finance Minister Nhlanhla Nene earlier this month stated that, while South Africa’s 2015 economic growth target of 2% was achievable, it was not enough to deliver the tax revenue needed to combat the country’s challenges.
The World Steel Association has published the 2015 edition of the World Steel in Figures report, which shows an increase in steel production as well as provides an overview of steel industry activities from crude steel production to apparent steel use.
The 25-year master plan for Gauteng’s Aerotropolis project will go through a process of approval and adoption during June and July, says Aerotroplis project manager Jack van der Merwe. “We are also in the process of putting together a special purpose vehicle (SPV) to...
SOLAR PANELS The existing buildings in the Coega Industrial Development Zone lent themselves well to rooftop solar panel installations
The Coega Development Corporation (CDC) plans to fit 15 of its buildings, totalling 127 000 m2 of roof space, in the Coega Industrial Development Zone (IDZ), in the Eastern Cape, with solar panels.
The Supreme Court of Appeal’s (SCA’s) November 2014 judgment, ordering steel producer ArcelorMittal South Africa (AMSA) to hand over the 2003 Environmental Master Plan for its Vanderbijlpark steel plant to environmental pressure groups, confirmed the right of civil...
 
 
 
 
 
 
 
 
 
Alert Close
Embed Code Close
content
Research Reports Close
Research Reports are a product of the
Research Channel Africa. Reports can be bought individually or you can gain full access to all reports as part of a Research Channel Africa subscription.
Find Out More Buy Report
 
 
Close
Engineering News
Completely Re-Engineered
Experience it now. Click here
*website to launch in a few weeks
Subscribe Now for $96 Close
Subscribe Now for $96